Construction Cost Estimation
Create a detailed estimate using Appendix F from the textbook “Estimating in Building Construction.” This appendix includes a detailed set of plans to be used in the construction of a new convenience store.
Using Microsoft Excel, include quantities and pricing for site work, concrete, masonry, steel, and roofing. Also include pricing for all necessary equipment to be used along with any other general expenses.
Provide a total cost for the project including allowances for overhead expenses and profit. Once the estimate is complete, write a summary (using Microsoft Word) of the bid preparation and closing process.
Support work with research from the online course material, textbooks, and outside sources if necessary. Properly cite all sources using the APA format.
This assignment should include a Microsoft Excel spreadsheet. Name the spreadsheet as SU_CON4010_W5_A2_LastName_FirstInitial.xls. Submit the spreadsheet to the W5: Assignment 2 Dropbox by Tuesday, December 23, 2014.
| Assignment 2 Grading Criteria |
Maximum Points
|
|
Created a detailed estimate using Appendix F from the textbook “Estimating in Building Construction.” |
50
|
|
Provided a detailed set of plans to be used in the construction of a new convenience store that includes quantities and pricing for site work, concrete, masonry, steel, and roofing. |
50
|
| Provided pricing for all necessary equipment to be used along with any other general expenses. |
50
|
|
Provided a total cost for the project including allowances for overhead expenses and profit. |
30
|
| Provided a summary of the bid preparation and closing process. |
30
|
| Used correct grammar and spelling. |
20
|
| Supported the paper with research from the online course material, text, and outside sources and conformed to APA standards. |
20
|
| Total: |
250
|
.awasam-promo {
background-color: #9ED5EA;
color: white;
text-align: center;
padding: 10px;
}
.button {
background-color: #4CAF50;
border: none;
color: white;
padding: 10px 20px;
text-align: center;
text-decoration: none;
display: inline-block;
font-size: 16px;
margin: 4px 2px;
cursor: pointer;
border-radius: 10px;
}
.awasam-alert {
color: red;
}
“Get 15% discount on your first 3 orders with us”
Use the following coupon
FIRST15
Order Now
The post Construction Cost Estimation appeared first on Savvy Essay Writers.
